RACI Operational Demarcation Matrix (Facilities, IT, Security, and Tenant)
Plain-English definition
A responsibility chart showing which team is Responsible, Accountable, Consulted, and Informed (RACI) at every physical handoff point between facility plant gear and IT cabinets. Common boundaries include rack power strips, structured fiber panels, and liquid-cooling quick-disconnect couplings.
Why it matters on shift
In liquid-cooled racks, confusion over whether Facilities or IT Hardware Ops owns manifold bleed ports and quick-disconnect couplings causes either slow incident response or accidental coolant spills.
Illustrative operational example
In an illustrative high-density pod RACI chart, Facilities is Responsible for Facility Water System (FWS) piping, Coolant Distribution Units (CDUs), and overhead isolation valves, while IT Hardware Ops swaps server sleds after Building Management System (BMS) checks confirm dry, depressurized couplings.
Scope, code & safety boundary
Agree on and post the physical ownership boundary diagram before energizing new halls rather than debating valve authority during an active leak alarm.
Related courses & interactive lab practice
Physical & control-network (OT) security
High-density AI cooling & commissioning
Shift command, permits & reliability
Practice live readings and switching in "Zero-Downtime UPS Make-Before-Break Wrap" with no login required.
Primary standards & technical references