North Campus · Free interactive shift simulator

Walk the halls. Inspect live plant. Stabilize the shift.

  • Free to play · No signup required
  • 6 live plant missions + 20 inspectable stations
  • Keyboard, click-to-walk & mobile thumbstick

Step onto the 06:58 handover inside one connected hyperscale campus—linking the NOC command wall, IT and spine-fiber hall, 35 kW cold-aisle containment, 120 kW direct-to-chip GPU liquid pod, 13.8kV generator yard, 2N UPS vault, and economizer plant. Move freely, talk with on-shift specialists, see physical cause and effect, and read clear engineering debriefs.

06:58 Shift Handover · Free Campus Simulator

Walk or click anywhere across six interconnected facilities—or start right beside you in the NOC with the handover alarm storm. No account required; progress saves in your browser.

NOC & Shift Command Center
Stabilized 0/6Inspected 0/20
DISPATCH

06:58 HANDOVER · Start at the NOC Telemetry Wall right south of you [E], or walk north outside to drive the EV-04 service cart [F].

Six interconnected systems on one campus

Explore on foot or jump straight to any system.

Every mission runs inside the same North Campus plant—connecting BMS/EPMS alarm correlation, air containment, 120 kW direct-to-chip liquid cooling, standby diesel sync, 2N UPS switching procedures, and central-plant efficiency.

BMS / EPMS & Alarm TriageBeginner-friendly

Handover Alarm Storm & Sensor Triage

Correlate 19 shift-change alerts on a 1 ms SOE log, separate a stale 49°C thermistor from a real CHW pump lockout, and dispatch the right fix.

Root SOE timestamping, sympathy cascades & sensor cross-checks · 2 minCourse deep dive: Signal Room (Intermediate)
Air Cooling & ContainmentBeginner-friendly

35 kW Hot/Cold Aisle Containment Balance

Stop 41°C exhaust wrap-around in Pod A2 with 1U blanking panels and aisle roof doors, hold this campus's 18–22°C CRAH supply target, and cut fan power via cubic affinity laws.

Supply vs equipment-inlet envelopes, containment & fan affinity (P ∝ N³) · 2 minCourse deep dive: Thermal Reality (Beginner)
Direct-to-Chip Liquid CoolingIntermediate

120 kW AI CDU Strainer & Dew-Point Guard

Valve over a fouled 25 µm duplex strainer online, restore this pod's 22–28 psi scenario manifold ΔP, keep PG25 coolant ≥ 3°C above room dew point, and cover the 25% air residual.

Duplex filtration, manifold ΔP, condensation margin & hybrid heat split · 3 minCourse deep dive: AI Density Lab (Advanced)
Critical Power & GenerationIntermediate

Blackout Ride-Through & Live Synchroscope

While Li-Ion UPS batteries carry Reserve Bus B, trim 3.0 MW Diesel Gen G2 to 60.0 Hz and 480V and close ATS-B inside the 0° ±15° synchroscope window.

UPS battery bridge, governor/AVR trim & ANSI 25 phase sync · 2 minCourse deep dive: Utility to Rack (Beginner)
Switching Procedures & InterlocksAdvanced

Zero-Downtime 2N UPS Wrap-Around MOP

Confirm Partner Bus B sits below this campus's 48% scenario failover cap and verify bypass sync, then execute a 5-step make-before-break maintenance bypass and LOTO isolation on UPS-A.

2N failover headroom, static bypass, MBB interlocks & LOTO · 3 minCourse deep dive: Runbook Under Pressure (Intermediate)
Central Plant & Resource MetricsIntermediate

36°C Heatwave Economizer, PUE & Water Balance

At 36°C dry-bulb (18.5°C wet-bulb), dry coils bypass above 24°C return CHW—enable Stage 1 adiabatic wetting, open WSE pre-cooling, and stage chillers for CHW 10.5–12.5°C, PUE ≤ 1.19, and Water ≤ 420 L/min.

Dry-bulb WSE bypass lockout vs wet-bulb adiabatic pre-cooling, series chiller lift & PUE/WUE · 2 minCourse deep dive: Resource Ledger (Intermediate)

Operating & safety boundary: North Campus is an educational simulation only — not an operating procedure. Real electrical, mechanical, and LOTO work always requires a site-specific MOP, arc-flash PPE, and authorized switching.

Explore Shift Lead & Operations Track

From campus exploration to structured study

Follow your campus systems from entry foundations to shift leadership.

Each room on North Campus maps directly to Rackscale's self-paced curriculum so new entrants, technicians, mechanical and electrical engineers, controls specialists, and shift leads know exactly where to start and what comes next.

Simulation & safety scope: North Campus uses illustrative first-principles electrical, thermal, and hydraulic models for technical training. Simulated breaker, valve, and bypass controls are never instructions for operating live equipment—real facility work always requires site-specific approved MOPs/EOPs, arc-flash PPE, two-person verification, and personal LOTO authority.

Self-paced technical training

Go from interactive shift scenarios to full engineering lessons.

Each self-paced Rackscale course includes structured plain-language modules, annotated diagrams, worked calculations with explicit units and assumptions, decision checks, and a practical deliverable you keep.

$1,600$399Per self-paced course ($1,600 list price · Save $1,201 / 75%)
Clear prerequisites & levels
Arranged from zero-prerequisite entry courses to intermediate plant labs and advanced shift command.
Built around 12-hour shifts
Self-paced interactive studio modules you can pause and resume between day or night rotations.
Tangible engineering work product
Finish each course with an audited one-line, liquid-cooling readiness matrix, alarm playbook, or redlined MOP.