Sensible air-flow math and actuator saturation check on Cold Aisle 2
Illustrative aisle calculation: Contained Cold Aisle 2 carries 360 kW of air-cooled servers designed for a 12.0°C server chassis temperature rise (ΔT_air = 12.0°C, from 21.0°C inlet to 33.0°C exhaust; air volumetric heat capacity ρ·c_p ≈ 1.20 kJ/m³·°C at sea level).
- Step 1
Calculate minimum server airflow demand with units: Using Q = V_dot × ρ·c_p × ΔT, V_dot_servers = 360 kW ÷ (1.20 kJ/m³·°C × 12.0°C) = 25.0 m³/s (~53,000 CFM).
- Step 2
Size CRAH aisle delivery for slight positive ΔP (~5% seal margin): CRAHs in Aisle 2 must deliver ~25.0 × 1.05 ≈ 26.3 m³/s (~55,650 CFM). Delivering only 22.0 m³/s forces 3.0 m³/s of 33°C hot exhaust to recirculate backward into top-U intakes.
- Step 3
Check saturated-coil trap: If CRAHs already show Fan = 100%, CHW Valve = 100%, and Discharge Air = 27.9°C, typing a 17.0°C setpoint adds 0 m³/s and 0 kW; check central chilled-water supply temperature and header ΔP immediately.
Optional depth · Scope boundaries & modeling assumptions
Scope & assumptions: Air density ρ decreases significantly at high-altitude sites (e.g., Denver/Johannesburg require ~15% to 20% higher volumetric m³/s / CFM per kW), and target ΔP (+2.5 to +12 Pa) varies by containment construction.