Calculating PUE₁ vs PUE₃ and catching a missing sub-meter via utility reconciliation
Illustrative monthly audit: Utility revenue bills show 8,640,000 kWh (8,640 MWh) delivered to Site B in May (zero solar/generator run). Internal EPMS summary reports: Total Facility Tag = 7,920 MWh, UPS Output = 6,850 MWh, Smart Rack PDU Output (IT Input) = 6,600 MWh.
- Step 1
Reconcile EPMS Total against Utility Revenue Meter with units: Discrepancy = 8,640 MWh − 7,920 MWh = 720 MWh missing (8.3% of building energy). Investigation reveals newly added Chiller Skid CH-4 (averaging ~968 kW × 744 hours ≈ 720 MWh) was never added to the EPMS summation formula.
- Step 2
Compute true corrected Category 1 vs Category 3 ratios: True E_DC = 8,640 MWh. True PUE₁ (UPS output) = 8,640 MWh ÷ 6,850 MWh = 1.261 (~1.26). True PUE₃ (Rack IT input) = 8,640 MWh ÷ 6,600 MWh = 1.309 (~1.31).
- Step 3
Quantify how big the pre-audit error was: Unaudited EPMS tag ÷ UPS output gave 7,920 ÷ 6,850 = 1.156, understating true PUE₃ (1.31) by 0.15 purely from a missing chiller tag and unlabeled category.
Optional depth · Scope boundaries & modeling assumptions
Scope & assumptions: Mixed-use buildings (sharing large office floors) or cogeneration/chilled-water-district campuses follow ISO/IEC 30134-2 thermal/electrical weighting factors.