Selective Overcurrent Coordination and Time-Current Curves (TCC)

#selective-coordination
Also called
  • Selective Coordination
  • Time-Current Curve
  • Upstream Trip Prevention
  • Breaker Trip Settings

Plain-English definition

Engineering upstream and downstream circuit breaker pickup thresholds and time delays so that only the protective device immediately upstream of a short circuit or overload opens, leaving healthy sibling feeders and upstream UPS buses uninterrupted.

Why it matters on shift

When coordination curves overlap, or after someone dials an upstream breaker's instantaneous pickup down without an engineering study, a single shorted server PSU can skip the rack breaker and trip an entire 400 kVA floor PDU.

Illustrative operational example

In an illustrative time-current study, a 20 A rack branch breaker clears a bolted fault in 8 ms while the upstream 225 A RPP feeder breaker waits in short-time delay, confining the outage to one cabinet cord.

Scope, code & safety boundary

Never alter electronic trip-unit dials (long-time, short-time, instantaneous, or ground-fault settings) in the field without a stamped coordination and arc-flash study; slower clearing times directly raise arc-flash incident energy.

Related courses & interactive lab practice

BeginnerRS-102~87 min open lessons
Utility to Rack

Critical power & dual-path feeds

IntermediateRS-201~82 min open lessons
Runbook Under Pressure

Maintenance procedures, hold gates & response

Free interactive simulator
Campus Shift · 6-Mission Browser Lab

Practice live readings and switching in "2N Blackout & Live Diesel Synchroscope" with no login required.

Primary standards & technical references

Practice with the equipment

Try this concept in a live scenario.

Walk through six free guided browser missions in Campus Shift, or study all nine self-paced courses from Beginner to Advanced at $399 self-paced tuition ($1,600 list, save $1,201).